Strijen / Completed

René’s kitchen feature walls in Strijen

  • Preparing the kitchen wall
  • Metal framing and plywood
  • Lighting and finishing

Custom feature walls prepared for the kitchen installation, with metal framing, plywood and integrated lighting.

Project timeline

December 2025

Before & after

René’s kitchen feature walls in Strijen — After renovationRené’s kitchen feature walls in Strijen — Before renovationBeforeAfter
René’s kitchen feature walls in Strijen

The house renovation was followed by a separate kitchen project. The walls needed to follow the client’s design and accommodate the fixings and lighting associated with the kitchen.

02 / Step by step

The project in phases

Phase 1

Kitchen Feature Wall with Spotlights

The client’s drawing guided the wall, framing and recessed lighting. The final construction used 18 mm plywood instead of the MDF originally offered.

The client’s design set the direction. The wall shape, fixing positions and lighting were coordinated for the kitchen installation.

This was a return to René’s home after the larger house renovation. The purpose was now more specific: form the walls around the kitchen design and integrate the lighting and oven connection. The position of the finished faces matters because the kitchen units and appliances have to fit against them.

A feature wall also has a practical role. Its construction creates space for wiring and fixing points, while its proportions determine how the kitchen sits within the room.

We built the feature walls on metal framing and lined them with plywood. This formed the client’s design and provided the base for finishing.

The final construction used 18 mm plywood in place of the MDF originally proposed. The metal framework established the shape, with the board layer providing the surface to receive the finish. This material change is part of the actual project, rather than a description copied from the first design.

Edges, corners and board junctions are particularly visible on this kind of work. Their preparation influences whether the wall reads as a single designed element after painting.

Why this matters

The underlying construction determines the shape and junctions of the visible joinery.

Phase 2

Feature-Wall Painting

The wall preparation and paint finish followed the changed material and agreed colour, with careful junctions around the recessed details.

Recessed spotlights were incorporated into the joinery, followed by the wall finishes. This separate kitchen project was carried out in December 2025.

Lighting was included within the wall construction rather than added as a separate visible fitting afterwards. The paint selection was also revised during the project. Together, these choices linked the practical kitchen installation to the appearance of the surrounding walls.

This story shows why custom kitchen preparation extends beyond building a partition: the frame, board material, electrical provisions and final colour all meet in the same small area.

Why this matters

Integrated lighting belongs in the wall design from the outset so openings and connections are correctly positioned.

Phase 3

Waste Handling

Removal of offcuts, transport of waste and cleaning complete this separate December project.