Choose a job. Learn by doing.

Walls, floors, bathroom or toilet. Pick up a tool, try each step and see your work take shape.

A safe place to practise. Real building work still needs a project plan, product instructions and the right professional checks.

HWR / YOUR JOB

Build a warm floor

Build layer by layer towards underfloor heating, tiles and PVC.

00 / 35
Your steps 0 / 35

Scroll for all steps ↓

STEP 01 / 35 · QUICK CHECK

Start with a good plan

Have a professional check the floor design and local rules before you start.

Why? A good plan protects the house and the floor.

Has the floor plan been approved?
Getting your workbench ready…

Choose one answer.

More detail & sources

Educational exercise for a dry living space in the Netherlands; not an execution design, inspection or proof of compliance with all rules. Source reference date: 3 November 2026. Have qualified professionals assess the actual site, structure, permits, products and installations. The illustrated 2 × 80 mm PIR and 16 mm pipe are conditional design choices. The two finishes are laid side by side, never on top of each other. Technical details: 01 · Investigation and approved floor build-up Record levels, load-bearing structure, ground, moisture, heat loss, insulation and both floor finishes. Check the Omgevingsloket and local rules. Have a structural engineer assess the structural floor and excavation. When replacing floor insulation, the Bbl generally requires Rc ≥ 2.6 m²K/W, or the higher lawfully acquired level; determine the renovation rule that actually applies. A board's Rd is not the Rc of the entire floor. The existing floor, foundations and substrate determine which new build-up is possible. Requirements: • The permit/notification route and structural work plan have been assessed. • The floor build-up, dimensions, insulation calculation and heating design have been established. When to stop: No demolition, excavation or material orders without an established design. Checks: What determines the correct floor build-up? Investigation, applicable rules and a project-specific design Existing buildings and new buildings may have different requirements. I understand that this game does not provide project approval.

Practise with two separate floor zones; have professionals design and approve real work.

The 3D view is a simple model. For real work, use the project plan and the current instructions for your products.

Some product sources below are in Dutch.