Rotterdam / Project

Martijn’s parquet floor in Rotterdam

  • Preparing the base
  • Herringbone through several rooms
  • Skirting and junctions

A continuous engineered-parquet herringbone floor connecting hall, living space and bedroom.

Project timeline

December 2025

Before & after

Martijn’s parquet floor in Rotterdam — After renovationMartijn’s parquet floor in Rotterdam — Before renovationBeforeAfter
Martijn’s parquet floor in Rotterdam

Martijn wanted one pattern continuing through several rooms, requiring a prepared base and a layout that works at doorways and edges.

02 / Step by step

The project in phases

Phase 1

Preparing the base

We prepared and primed the cement-based substrate for bonding. The client supplied the parquet and skirting; we carried out installation with the necessary adhesives.

Martijn’s floor was bonded to a cement-based substrate. The final preparation and adhesive package changed from the original proposal: Mapei Primer G, Frencken HE330 and Romaxx parquet adhesive replaced the initially listed Thomsit system. The final installation therefore used a revised preparation and bonding package.

The important construction point is that the base, primer and adhesive belong to the installation beneath the timber, even though only the parquet remains visible.

Why this matters

Parquet and adhesive need to suit the condition of the base.

Phase 2

Herringbone through several rooms

Approximately 50 m² of 15 mm engineered parquet was laid in herringbone. The pattern continues between hall, living/dining space and bedroom without separate transition strips between those rooms.

The 15 mm engineered boards measured approximately 12 × 60 cm. Their repeated herringbone arrangement continued through the hall, living/dining area and bedroom without dividing those rooms with separate transition strips. This made the relationship between the rooms part of the setting-out work.

A continuous pattern draws the eye through doorways. Small alignment decisions at the beginning influence how the pattern reaches the far side of the next room.

Why this matters

A continuous pattern needs its alignment considered beyond a single room.

Phase 3

Skirting and junctions

We installed the client-supplied skirting and finished the junctions, completing the transition from patterned floor to walls. The work took place in December 2025.

Approximately 38 metres of client-supplied skirting formed the finishing package around the rooms. Cutting, fitting and finishing these edges connected the new timber floor to existing walls and doorways.

The December work brought together a continuous patterned floor and its perimeter details. It was an installation project using the client’s chosen parquet, with the preparation and bonding materials supplied for the work.

Why this matters

Edges and doorways form part of the overall floor, even when less noticeable than the pattern.