Nijmegen / Project

Jill & Job’s house renovation in Nijmegen

  • The opening and services
  • A level OSB base
  • Custom joinery and colour
  • Renewing the roof terrace

From a structural opening and new services to custom joinery, colour and a renewed roof terrace.

Project timeline

January–March 2026

Before & after

Before

Photos coming soon

After

Photos coming soon
Jill & Job’s house renovation in Nijmegen

Jill and Job’s layout needed structural work, floor preparation and finishes. During the project, the flooring choice changed and the work expanded to custom joinery and the roof terrace.

02 / Step by step

The project in phases

Phase 1

Demolish Structural Wall & Beam Installation

The structural opening was prepared with temporary support and a beam. Later beam work and the changed opening were recorded separately from the general interior finishes.

We formed the structural opening with an HEA160 beam and prepared the kitchen and toilet. New service routes and an expanded three-phase ABB installation provided the connections, including lighting and extra kitchen points.

Jill and Job’s renovation combined a changed room connection with the services for the kitchen and toilet. The HEA160 beam belonged to the structural opening; the expanded three-phase ABB installation belonged to the electrical package. Both had to be addressed before the visible surfaces were completed.

Additional lighting and kitchen points made the service layout part of the room design, rather than simply renewing the existing accessories in their old positions.

Why this matters

The new layout also needs to work behind the walls.

Phase 2

Demolition – Kitchen & Toilet Areas

The old kitchen, toilet, ceiling sections and the specified wall parts were removed for the new layout.

Phase 3

Subfloor / Ceiling & Piping Access Works

Floors and ceilings were opened where needed to reach existing pipes and inspect the routes before rebuilding.

Phase 4

New Kitchen Drainage (Basement Connection)

The new kitchen waste route connects through the basement. The access openings and pipe path were coordinated with the retained structure.

Phase 5

Install New Water / Gas Network

Water and gas routes were adapted to the revised kitchen and sanitary layout before the surfaces were closed.

Phase 6

New ABB Electrical Fuse Box

The distribution board was upgraded. The addendum changed the original six-group arrangement to nine groups to serve the updated installation.

Phase 7

Electrical Layout & Sockets

The revised package added recessed cable routes, wall lights, switches and sockets, with additional kitchen points and a living-room lighting solution.

Phase 8

Floor Demolition & Skirting Preparation

The existing floor finish and skirting were removed where specified so the new base could be prepared.

Phase 9

New Pine Wood Floor Installation & Lacquering

Replaced scope: the planned pine flooring, sanding and lacquer system were cancelled. HWR instead installed and levelled an OSB base across approximately 75 m² without steps between rooms.

The original plan for a new pine floor changed. Instead, we installed 18 mm OSB to prepare the base and transitions. The toilet floor received additional reinforcement. A final timber floor and upstairs carpet were outside our package.

The shift from a new pine floor to an 18 mm OSB base changed the role of HWR’s flooring work. The task became preparation of the supporting surface and its transitions, rather than supplying the originally discussed visible timber floor.

Reinforcement in the toilet area was a separate part of that preparation. Final timber flooring and upstairs carpet were outside our package, so the prepared base should not be described as a completed decorative floor.

Why this matters

A usable base needs to suit the finish that follows.

Phase 10

Doors & Staircase Adjustments

The original offer’s first joinery stage covers refitting and repairing doors and staircase details around the changed floor and openings.

Phase 11

Doors & Staircase Adjustments – Skirting Work

The offer repeats the heading for a separate skirting and sealing stage. The updated scope removed the specified skirting work; it is retained here as a recorded change.

Phase 12

Toilet Renovation (Complete)

The toilet package includes the frame, drainage and water connections, tiling and ceiling. Added work included floor reinforcement, a mixed small-tile pattern, a cabinet and a dedicated ventilation box.

Phase 13

Plastering Walls & Ceilings

New and repaired surfaces were plastered, including later ceiling restoration and repair of the gap left by removed timber.

Phase 14

Painting Walls & Ceilings

Painting followed the prepared surfaces, with colour changes and additional ceiling areas recorded in the updated work.

Phase 15

Painting Wood, Frames & Staircase

The joinery painting includes the specified doors, frames and staircase. The addendum included the interior faces of balcony doors and windows and the entrance door.

We made twelve shelves and a narrow plywood toilet cabinet, adjusted doors and finished stairs, joinery, ceilings and walls in several colours. The toilet received a small-format tile pattern. Lighting and connections were coordinated with the joinery.

Twelve shelves and a narrow plywood toilet cabinet brought custom fitting into the renovation. Their dimensions and fixing arrangements had to work with the space available. Doors, stairs and joinery were also included in the colour and finishing work.

The small-format toilet tiles added a different scale of detail. Together with lighting and the cabinet, they made the toilet a designed part of the project rather than a room treated only through its plumbing.

Why this matters

Custom joinery needs room for fixings, practical use and connections from the outset.

Phase 16

Carpet Installation – Second Floor

Cancelled scope: the proposed client-supplied carpet installation was removed. This phase stays in the sequence to distinguish the original plan from the work carried out.

Additional work

Roof Terrace Renovation

The roof terrace was an additional package beyond the sixteen original phases, with its own waterproofing and finishing details.

We removed the old decking and supports and prepared the roof base. A new timber support structure and spaced deck boards were installed over EPDM protection pads. The package covered the deck, not new guardrails.

The terrace package began by removing the existing boards and supports. New timber supports and spaced decking formed the replacement, with EPDM protection pads separating the contact points from the roof surface. Those interfaces matter because the terrace sits over a roof.

This package renewed the deck construction and finish. Guardrails were not included, keeping the scope distinct from a complete replacement of every terrace element.

Why this matters

Deck supports need to meet the roof without unnecessarily stressing or damaging its covering.