Clearing and refinishing commercial premises, from the old fit-out to walls, joinery, metalwork and ceiling panels.
16HWR / PROJECT
Project timeline
December 2025
Before & after
BeforeAfter
Willem’s interior renovation in Breda
For Willem, the work began with removing the existing fit-out. Only then were the different surfaces accessible for the renewed paint finish.
02 / Step by step
The project in phases
Phase 1
Demolition & Waste Clearance
The old commercial fit-out, redundant fittings and waste were removed to open the interior for preparation.
We removed the agreed reception counter, furniture, shelving, floor layers, partitions and old kitchen and toilet elements. Unused cabling and fixings were cleared as well. Additional waste removal was needed beyond the original container.
Willem’s project involved an existing commercial fit-out with many separate elements to clear. Reception furniture, partitions and redundant fittings interrupted the surfaces that needed renewal. Removing them exposed the full area for preparation and painting.
The additional waste removal reflects the extent of that strip-out. The project therefore began with dismantling and clearing, rather than immediately applying a new colour.
Why this matters
Clearing the space exposes the surfaces and keeps old fittings out of the way.
Phase 2
Cleaning & Surface Preparation
Nails and screws, dirt and loose material were removed; the surfaces were prepared for the new paint system.
The offer uses this heading, but its Phase 3A work rows specify primer and white wall paint. The story follows those paint items rather than claiming an unconfirmed electrical rewiring package.
Phase 3B
Wood & Metal Painting
Timber and metal received their own preparation, primer and finish-coat treatment, separate from the wall paint.
We cleaned and degreased the surfaces and protected retained elements. Walls, frames, stairs and other timber and metal components received suitable preparation and coatings, renewing the space as a whole.
Walls, timber and metal do not all receive the same preparation. Cleaning and degreasing remove contamination, while the appropriate primer and finish depend on the surface being coated. Stairs, frames and remaining elements introduced many edges alongside the larger wall areas.
Treating these components within one package gave the stripped interior a consistent new appearance without confusing the wall-painting work with the separate timber and metal finishes.
Why this matters
Different substrates need appropriate preparation and paint systems.
Phase 3C
Foam Ceiling Replacement
The specified ceiling panels were replaced as a separate part of the interior renewal.
Approximately 55 m² of the suspended ceiling received new OWA panels, followed by cleanup and final junction work. The project took place in December 2025.
The new OWA ceiling panels renewed an area of approximately 55 m² within the suspended ceiling. This was panel replacement, a different type of work from plastering a continuous ceiling. It completed the overhead surface alongside the painted walls and joinery.
By the end of the December package, the old fit-out had been cleared and the agreed surfaces and ceiling sections renewed, providing a different starting point for the space’s next use.
Why this matters
The ceiling contributes to the appearance of the entire commercial space.
Phase 11
Final Cleaning & Handover
The offer labels its final stage Phase 11. Masking removal, small touch-ups and broom-clean handover complete the work.