Skip to content
← All projects

Breda / Project

Edwin’s interior renovation in Breda

  • Click-PVC in herringbone
  • Television wall and wardrobe doors
  • Plaster, paint and electrical details

Herringbone flooring, custom television and wardrobe joinery, and renewed plaster and paint finishes.

Project timeline

July–August 2026

Edwin’s interior renovation in BredaPhotos of this phase coming soon
Edwin’s interior renovation in Breda

Edwin’s project combined large flooring areas with detailed joinery. The renewed finish needed to suit the existing ceiling details, doors and services.

02 / Step by step

The project in phases

Phase 1

Click-PVC in herringbone

We laid client-supplied click-PVC in herringbone across approximately 190 m² and finished the edges with tall skirting, coordinating the pattern with rooms and doorways.

Why this matters

A continuous pattern needs planning before the first rows are laid.

Click-PVC in herringbonePhotos of this phase coming soon
Click-PVC in herringbone

Phase 2

Television wall and wardrobe doors

We built a television wall with a screen recess and provision for cables and connections. A gap above the wall retained space around the existing cornice. Timber wardrobe doors were made with their required supports and hardware.

Why this matters

Custom work needs to fit the room as well as the screen or cabinet dimensions.

Television wall and wardrobe doorsPhotos of this phase coming soon
Television wall and wardrobe doors

Phase 3

Plaster, paint and electrical details

Finishing included revised plaster work, painted walls and ceilings and expanded door and roof-window finishing. Electrical accessories, wall-light points and dimmers were incorporated. Staircase finishing included side panels and rails.

Why this matters

The final junctions connect the main surfaces to the custom joinery.

Plaster, paint and electrical detailsPhotos of this phase coming soon
Plaster, paint and electrical details